Today turned out to be excellent with the weather holding off, allowing us to construct our wall.
When the group arrived we were happy to see that our bricks had turned out quite well. Something that as a group we were all worried about, however after seeing them stacked today we were quite happy at our effort.
The day started off with a lot of preparation. Having come to an agreement on where it would be best to construct our wall. So we created a strong level surface that would be suitable for the wall.
After organising materials for the days work. We then started on the frame using MGP10 timber to create a stud.
Once in place and propped up, we began construction and then formed our wall.
As a group we were very pleased with the performance of the day. Considering both walls were put up. By doing this we will allow the wall to set and mean that the next time we meet, we will be able to construct the roof and come close to finalising the wall.
Photos from today:
Here is a close up showing the accuracy of the level of our lintel. As a group we were worried that the wall would be out of shape either side, or that the bricks wouldn't line up at the top, however from the placing the lintel and checking the level, we were very pleased.
- As a conclusion this is the end of a long days work. We had successfully constructed the wall with the window boxed out ready to be installed. As a group we were very pleased with the outcome.
Now we nervously wait and hope the wall will set in this weather.